Jezik: | Slovenski jezik |
---|---|
Leto izida: | 2018 |
Tipologija: | 2.09 - Magistrsko delo |
Organizacija: | UL FGG - Fakulteta za gradbeništvo in geodezijo |
Založnik: | [P. Janko] |
UDK: | 627.8.09(282.24)(043.3) |
COBISS: | 8395873 |
Št. ogledov: | 1290 |
Št. prenosov: | 2494 |
Ocena: | 0 (0 glasov) |
Metapodatki: |
Sekundarni jezik: | Angleški jezik |
---|---|
Sekundarni naslov: | Variant analysis of the hydro potential use on the border Mura river |
Sekundarni povzetek: | This thesis addresses the field of hydro energetics. A variant analysis of possibilities of the hydro potential use on the Mura river between the area Špilje and the area Sladki vrh hydroelectric power plant is carried out. Three of the most promising locations are compared in the thesis. The first one is the location of the existing little Ceršak hydroelectric power plant. The second one is at the confluence of the Mura river and the drain canal of the little Ceršak hydroelectric power plant. The third location is before the Sladki vrh settlement. The hydroelectric power plant whose economic indicators are the best is chosen in the conclusion. |
Sekundarne ključne besede: | civil engineering;master thesis;hydro power plant;hydrotechnics;hydropower;dams;Mura river; |
Vrsta dela (COBISS): | Magistrsko delo/naloga |
Študijski program: | 0 |
Konec prepovedi (OpenAIRE): | 1970-01-01 |
Komentar na gradivo: | Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Strani: | XX, 83 str., 4 pril. |
ID: | 10927459 |