diplomsko delo visokošolskega strokovnega študijskega programa
Abstract
V diplomskem delu so predstavljeni tehnološki procesi grajenja in terminsko planiranje rekonstrukcije ceste Proseniško–Žepina. V uvodnem delu so opisani problem, namen in cilj diplomskega dela. Sledi splošni del, v katerem so predstavljeni podatki o projektu, seznam udeležencev, rok gradnje, zapora ceste in obvoz ter projektna dokumentacija. V jedru diplomskega dela sledi proučitev pogojev za gradnjo, kjer so bile proučene dokumentacija o lokaciji objekta, topografske razmere in klimatsko-meteorološke razmere. Proučeni so bili tudi možnost pridobitve materiala in surovin, prometne razmere ter gradbena pogodba, predmet pogodbe in pogodbena cena. V nadaljevanju so nato predstavljeni tehnološki procesi grajenja, kjer so opisani potek dela in uporabljena tehnologija ter material pri posamezni aktivnosti. V poglavju planirani potek gradnje je izdelan terminski plan. Predstavljene so aktivnosti, njihov čas trajanja ter povezave med aktivnostmi. Izdelana sta tudi spremljajoči načrt virov in statični spremljajoči plan delavcev. Ob koncu diplomskega dela je prikazan terminski plan za rekonstrukcijo ceste Proseniško–Žepina. Rezultat dela sta modificiran gantogram in strukturni mrežni diagram.
Keywords
gradbeništvo;rekonstrukcija;terminsko planiranje;tehnološki procesi;diplomske naloge;
Data
Language: |
Slovenian |
Year of publishing: |
2018 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UM FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture |
Publisher: |
[A. Veličkovič] |
UDC: |
69.05:625.76(043.2) |
COBISS: |
21665558
|
Views: |
550 |
Downloads: |
346 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
Technological processes of construction and time scheduling of Proseniško - Žepina road reconstruction |
Secondary abstract: |
The diploma thesis presents The technological processes of construction and time scheduling of Proseniško-Žepina road reconstruction. The introductory section describes the problem, purpose and goal of the diploma thesis. This is followed by a general section, which includes project information, a list of participants, construction deadline, road closure and detour, and project documentation. The body of the diploma thesis studies the conditions for construction, examining the documentation on the facility’s location, topographic conditions, and climatic and meteorological conditions. The possibility of obtaining materials and raw materials, the traffic conditions, the construction contract, the subject of the contract, and the contract price were also examined. The thesis continues with a presentation of the technological processes of construction, describing the course of the work itself and the technology and materials used in an individual activity. In the chapter Planned Course of Construction, a schedule is made. It presents the activities, their duration, and links between activities. In addition, an accompanying resource plan and an accompanying static work plan are made. In the final part of the diploma paper, the schedule of the reconstruction of the Proseniško-Žepina road is shown. A result of the research is a modified Gantt chart and a structural network diagram. |
Secondary keywords: |
civil engineering;reconstruction;time scheduling;technological processes; |
URN: |
URN:SI:UM: |
Type (COBISS): |
Bachelor thesis/paper |
Thesis comment: |
Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo, Gradbeništvo |
Pages: |
VII, 76 str., [7] zganj. pril. z načrti |
ID: |
10939715 |