diplomsko delo visokošolskega študijskega programa
Povzetek
Diplomsko delo predstavlja določitev treh bistvenih faz za pripravo gradnje objekta. To so organizacija gradbišča, določitev tehnoloških procesov in terminskih planov gradnje trgovskega objekta v Zrečah. V prvem uvodnem delu diplomskega dela so opisani problemi, nameni in cilji gradnje, sledi splošni opis objekta. V jedru diplomskega dela so prikazani proučitev pogojev za gradnjo objekta, organizacija gradbišča in tehnološki procesi grajenja. Ob koncu diplomskega dela je prikazano terminsko planiranje za trgovski objekt v Zrečah. Kot rezultat celotnega dela dobimo shemo ureditve gradbišča, modificiran gantogram in strukturni mrežni diagram.
Ključne besede
gradbeništvo;organizacija gradbeništva;tehnološki procesi grajenja;terminsko planiranje;diplomske naloge;
Podatki
Jezik: |
Slovenski jezik |
Leto izida: |
2017 |
Tipologija: |
2.11 - Diplomsko delo |
Organizacija: |
UM FGPA - Fakulteta za gradbeništvo, prometno inženirstvo in arhitekturo |
Založnik: |
[F. Vezaj] |
UDK: |
69(043.2) |
COBISS: |
21052950
|
Št. ogledov: |
893 |
Št. prenosov: |
194 |
Ocena: |
0 (0 glasov) |
Metapodatki: |
|
Ostali podatki
Sekundarni jezik: |
Angleški jezik |
Sekundarni naslov: |
Organization of building site, technological processes and time scheduling for construction of shopping facility in Zreče |
Sekundarni povzetek: |
The thesis presents the three essential stages of preparing for construction, which comprise organization of building site, determination of technological processes and time scheduling for construction of shopping facility in Zreče. In its preliminary part, the thesis introduces potential problems, the facility’s intended usage and building objectives. This is followed by a general description of the facility. The central part of the thesis contains a study of the construction conditions, building site organization and the relevant technological processes. The final part of the thesis presents time scheduling for the shopping facility in Zreče. The final result of the thesis includes a schematic organization, a modified Gantt chart and a network diagram of this building site. |
Sekundarne ključne besede: |
civil engineering;organization of building site;technological processes of construction;time scheduling; |
URN: |
URN:SI:UM: |
Vrsta dela (COBISS): |
Diplomsko delo/naloga |
Komentar na gradivo: |
Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo, Gradbeništvo |
Strani: |
IX, 99 f., [3] zganj. pril. z načrti |
ID: |
10863168 |