diplomska naloga št. 407/B-GR
Abstract
Diplomska naloga obravnava generacijo prometa v primeru priključevanja nove obrtne cone v vasi Vaše na obstoječe cestno omrežje. Drugače povedano, koliko dodatnih prometnih obremenitev nastane v primeru nastanka obrtne cone. Generacija je odvisna predvsem od velikosti in dejanske rabe novonastalih objektov. V bodoči obrtni coni je predpostavljena gradnja skladišč in delavnic. Narejena je kapacitetna analiza dveh križišč. Gre za križišče v Vašah, poleg predvidene obrtne cone, ter za križišče v središču Medvod, preko katerega bodo vozila prihajala na obravnavano območje. Analiza je narejena za obstoječe stanje kot tudi za stanje, ki vključuje dodatne prometne obremenitve.
Keywords
gradbeništvo;diplomske naloge;UNI;GR;B-GR;prometno planiranje;kapacitetna analiza;generacija potovanj;križišče;cestno omrežje;
Data
Language: |
Slovenian |
Year of publishing: |
2021 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UL FGG - Faculty of Civil and Geodetic Engineering |
Publisher: |
[K. Jenko] |
UDC: |
656.1(043.2) |
COBISS: |
100803843
|
Views: |
309 |
Downloads: |
131 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
Capacity analysis of connecting craft zone Vaše to the existing road network |
Secondary abstract: |
This diploma thesis deals with the trip generation in the case of connecting a new craft zone in the village of Vaše to the existing road network or in other words, how much additional traffic load would be created in case of a craft zone. The generation depends mainly on the size and actual use of the newly created facilities. The construction of warehouses and workshops is assumed in the future craft zone. A capacity analysis of two crossroads was made. It is a crossroads in Vaše, next to the planned craft zone, and a crossroads in the center of Medvode, through which vehicles will come to the area in question. The analysis is done for the existing situation as well as for the situation involving additional traffic loads. |
Secondary keywords: |
graduation thesis;civil engineering;transportation forecasting process;capacity analysis;trip generation;intersection;road network; |
Type (COBISS): |
Bachelor thesis/paper |
Study programme: |
0 |
Embargo end date (OpenAIRE): |
1970-01-01 |
Thesis comment: |
Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Pages: |
39 str., [9] str. pril. |
ID: |
14610490 |