diplomska naloga št.: 455/B-GR
    	
    Abstract
 
V diplomski nalogi je predstavljena tehnika linearnega planiranja in programsko orodje TILOS. Predstavljeni so koraki izdelave terminskega plana v programskem orodju TILOS na podlagi dejanskega primera. Obravnavani del trase je dolg 3500 m, celotna trasa kolesarske poti pa 9500 m. S pomočjo plana, izdelanega v Excelu, sem izdelal terminski plan v TILOS-u. Plan, izdelan v Excelu in plan, izdelan v TILOS-u, sem na koncu tudi primerjal med seboj. Izvedel sem še dve spremljavi plana in predstavil, kako so ugotovljena odstopanja vplivala na izvedbo projekta.
    Keywords
 
gradbeništvo;diplomske naloge;UNI;GR;B-GR;planiranje;programsko orodje TILOS;terminski plan;
    Data
 
    
        
            | Language: | Slovenian | 
        
        
            | Year of publishing: | 2023 | 
            
        
        
            | Typology: | 2.11 - Undergraduate Thesis | 
            
        
            | Organization: | UL FGG - Faculty of Civil and Geodetic Engineering | 
        
            | Publisher: | [A. Vasilić] | 
   
        
            | UDC: | 004.42:625.711.4(497.4)(0043.2) | 
   
        
        
            | COBISS: | 178303747   | 
        
        
  
        
            | Views: | 1690 | 
        
        
            | Downloads: | 159 | 
        
        
            | Average score: | 0 (0 votes) | 
        
            | Metadata: |                       | 
    
    
    Other data
 
    
        
            | Secondary language: | English | 
        
        
            | Secondary title: | ǂThe ǂplan for the construction of a bicylcle path on the route from Velenje to Huda Luknja | 
        
        
        
            | Secondary abstract: | Thesis presents the technique of linear planning and the software tool TILOS. It outlines the steps for creating a schedule, using the TILOS software, based on a real-world example. The specific section of the route under consideration is 3,500 meters long, while the entire bicycle path spans 9,500 meters. Utilizing a schedule created in Excel as a reference, I created a schedule in TILOS. At conclusion of the study, I compared the Excel-generated schedule with the TILOS-generated schedule. I performed two schedule tracking and explained how the identified deviations impacted the project's execution. | 
        
        
            | Secondary keywords: | graduation thesis;civil engineering;planning;software TILOS;time schedule; | 
        
            
        
            | Type (COBISS): | Bachelor thesis/paper | 
        
        
           
        
           
        
           
        
           
        
            | Thesis comment: | Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo | 
        
           
        
           
        
           
        
            | Pages: | VIII, 32 str., [5] f. zganj. pril. | 
        
           
        
           
        
           
        
           
        
           
        
           
        
           
        
           
        
          
        
          
        
          
        
         
        
         
        
        
            | ID: | 22289751 |