diplomska naloga št.: 462/B-GR
Gaj Kump (Author), Bojan Čas (Mentor), Aleksander Srdič (Co-mentor)

Abstract

V diplomski nalogi je opisana metoda linearnega planiranja pri linijskih projektih, metoda je predstavljena tudi z uporabo programskih orodji Microsoft Excel in Tilos. Kot primer projekta je obravnavan realen primer predora T2, ki bo izveden v sklopu projekta Drugi tir Divača – Koper. Analiziran je obstoječi terminski plan, ki je bil izdelan v programskem okolju Excel, dodatno pa je predstavljen tudi terminski plan, ki smo ga izdelali v s programskim paketom Tilos. Ker se predore pri nas izvaja po t.i. Novi avstrijski metodi, so predstavljeni njeni postopki in posebnosti. Predstavljene so tudi posebnosti pri sestavi pogodbe med naročnikom in izvajalcem ter njena določila, ki se zaradi nepredvidljivosti geologije pri izkopu, oblikujejo drugače kot pri večini ostalih pogodb.

Keywords

gradbeništvo;diplomske naloge;UNI;GR;B-GR;predorogradnja;NATM;linearno planiranje;Tilos;prilagodljiva gradbena pogodba;časovne norme;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UL FGG - Faculty of Civil and Geodetic Engineering
Publisher: [G. Kump]
UDC: 624.19:658.513.3/.4(043.2)
COBISS: 178361859 Link will open in a new window
Views: 176
Downloads: 12
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Developing a timetable for the construction of the tunnel based on the Linear Scheduling Method
Secondary abstract: The thesis describes Linear Scheduling Method used for linear projects, method is presented using Microsoft Excel and Tilos. Tunnel T2 from project Drugi tir Divača – Koper is taken as a real case study. The existing schedule, which was produced in Excel, is analysed, and the schedule produced in Tilos is presented in addition. As the tunnels in Slovenia are being made according to the so-called New Austrian Tunneling Method, its procedures are described in this paper, as well as tendering and costing procedures at contract drafting, as unpredictability in geology causeses diffrences between common contract practices and contracts in tunnel engineering.
Secondary keywords: graduation thesis;civil engineering;tunneling;NATM;linear project planning;Tilos;flexible construction contract;
Type (COBISS): Bachelor thesis/paper
Thesis comment: Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo
Pages: VIII, 27 str., 4 f. zganj. pril