Secondary language: |
English |
Secondary title: |
Cost analysis of center Cerknica project |
Secondary abstract: |
The thesis deals with the preparation of a detailed time schedule and financial plan, as well as
detailed cost analysis of planned and as-built construction works during execution of the
building under consideration. The first part consists of 4 chapters that deal with theoretical
background which is used in subsequent chapters where the cost analysis is performed. The
introduction presents the fundamentals of project management. Further, phases and special
features of a construction project are described. Project planning and relevant techniques for
resource, time and cost planning are outlined.
In the second part of the thesis, cost analysis of the project under investigation is presented.
Causes for inadequate financial outcome at the project completion are explained. The analysis
of data obtained from the existing documentation and comparison of the initial plan with the
as-built schedule results in identification of discrepancies and related causes. The results show
that the major reason for the cost increase was incomplete project documentation that forced
the client to modify the original specifications during construction. |
Secondary keywords: |
project management;project schedueling;scheduele plan;cost analysis; |
File type: |
application/pdf |
Type (COBISS): |
Undergraduate thesis |
Thesis comment: |
Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Pages: |
X f., 79 str., pril. |
Type (ePrints): |
thesis |
Title (ePrints): |
Analiza finančne realizacije projekta VDC Cerknica |
Keywords (ePrints): |
gradbeništvo;diplomska dela;VSŠ;vodenje projektov;operativno planiranje;terminski plan;analiza stroškov; |
Keywords (ePrints, secondary language): |
project management;project schedueling;scheduele plan;cost analysis; |
Keywords (ePrints, secondary language): |
project management;project schedueling;scheduele plan;cost analysis; |
ID: |
8311088 |