Secondary language: |
English |
Secondary title: |
Establishing a terrestrial micronetwork in the vicinity of the small HPP at Markovci dam |
Secondary abstract: |
My graduation thesis presents the restoration of a micronetwork at Markovci dam, which took place due to the newly erected HPP building on the right riverside of Drava. Demolition of one of the previous referential pillars of the network required adequate replacement. New control points have also been installed in the vicinity of the new building. The thesis describes the procedure of measurements, the equipment used and data processing. The last part of the thesis includes the presentation of the results of horizontal and altitude measurements with associated precisions. |
Secondary keywords: |
graduation thesis;HPP Markovci;estabilishment;stabilization;terestrical network;vertical network; |
File type: |
application/pdf |
Type (COBISS): |
Bachelor thesis/paper |
Thesis comment: |
Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Pages: |
XVIII, 38 str., 6 pril. |
Type (ePrints): |
thesis |
Title (ePrints): |
Establishing a terestrial micronetwork in the vicinity of the smal HPP at Markovci dam |
Keywords (ePrints): |
MHE Markovci;vzpostavitev;stabilizacija;horizontalna mreža;višinska mreža |
Keywords (ePrints, secondary language): |
HPP Markovci;establishment;stabilzation;terestrical network;vertical network |
Abstract (ePrints): |
V diplomski nalogi je predstavljena sanacija mikro mreže na jezu v Markovcih, zaradi novo grajenega objekta Male hidroelektrarne na desnem bregu reke Drave. Porušitev enega izmed referenčnih stebrov je zahtevala novo vzpostavitev ter vključitev novih kontrolnih točk na vplivnem območju stavbe. Opisan je postopek izvedbe meritev, uporabljena merska oprema ter obdelava podatkov. Ob koncu so podani tudi rezultati meritev horizontalne in višinske mreže s pripadajočimi natančnostmi. |
Abstract (ePrints, secondary language): |
My graduation thesis presents the restoration of a micronetwork at Markovci dam, which took place due to the newly erected HPP building on the right riverside of Drava. Demolition of one of the previous referential pillars of the network required adequate replacement. New control points have also been installed in the vicinity of the new building. The thesis describes the procedure of measurements, the equipment used and data processing. The last part of the thesis includes the presentation of the results of horizontal and altitude measurements with associated precisions. |
Keywords (ePrints, secondary language): |
HPP Markovci;establishment;stabilzation;terestrical network;vertical network |
ID: |
8312858 |