| Sekundarni naslov: | Establishing a benchmark for monitoring the stability of the outflow channel at the dam in Markovci |
| Sekundarni povzetek: | During the construction of small hydropower plant in Markovci, an elevation point – the benchmark, that allowed the transfer of height on spillways, was destroyed. The thesis presents the process of stabilization and determination of definite heights of the new benchmarks. We performed a survey of geometric levelling with a reference to the two baseline benchmark R36 and R37 to determine the definite height of two newly stabilized benchmarks and a re-measurement of the benchmarks on spillways. A height comparison was made of the benchmarks on the spillways with the last measurement in 2011 and an analysis of results. |
| Sekundarne ključne besede: | geodesy;dam Markovci;SHPP Markovci;benchmark stabilzation;vertical network;geometric levelling; |
| Vrsta datoteke: | application/pdf |
| Vrsta dela (COBISS): | Diplomsko delo/naloga |
| Komentar na gradivo: | Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
| Strani: | XVI, 24 str., [9] str. pril. |
| ID: | 9235985 |