Secondary language: |
English |
Secondary title: |
Cost analysis of constructing flood levees |
Secondary abstract: |
In the thesis I analyzed some prices of construction works from 1950s and did a cost analysis of building a super levee. Earth and concrete dams, percolation through the core of the embankment and foundation seepage beneath the dykes are presented in details. Much attention is given to the construction and use of new types of dams such as super-levees. Furthermore, the analysis of changing prices of some construction works are presented as the costs are important in the building of levees. The analyses of super-levees buildidng price changes for 63 years are presented, including the variability in the land prices, costs of soil excavations, price of sided notes, installation of reinforcement, concrete and humusation and green cover. In the last part of theisis an analysis of the cost of construction of three classis dams dimensioned for different flow rates and a comparison with the great dam built on the same work site was done. |
Secondary keywords: |
graduation thesis;civil engineering;flood;levee;super levee;construction work prices;cost analysis; |
File type: |
application/pdf |
Type (COBISS): |
Undergraduate thesis |
Thesis comment: |
Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Pages: |
XI, 51 str., 7 pril. |
Type (ePrints): |
thesis |
Title (ePrints): |
Cost analysis of flood-proofing levees |
Keywords (ePrints): |
poplava;nasipi;super nasipi;cene gradbenih del;analiza stroškov |
Keywords (ePrints, secondary language): |
flood;levee;super levee;construction work prices;cost analysis |
Abstract (ePrints): |
V diplomski nalogi sem obravnaval nekatere cene gradbenih del od leta 1950 naprej in hkrati naredil stroškovno analizo upravičenosti gradnje super nasipa. Podrobneje so v nalogi predstavljeni zemeljski in betonski nasipi ter pronicanje skozi jedro nasipa in pronicanje izpod temeljev nasipov. Veliko pozornosti je namenjeno tudi predstavitvi gradnje in uporabe novih tipov nasipov, in sicer gre za super nasipe. V diplomski nalogi je narejena tudi analiza spreminjanja cen nekaterih gradbenih del, ki so pomembna pri gradnji nasipov. Obravnavano obdobje obsega 63 let, in sicer gre za predračunske postavke odkupa zemljišč, izkopov različnih kategorij zemljine, cene obojestranskega opaža, vgradnje armature, betona ter humuziranje in zatravitev. Diplomska naloga v zadnjem delu predstavlja analizo stroškov gradnje treh klasičnih nasipov, dimenzionirane za različne pretoke in primerjavo s super nasipom, zgrajenim na istem območju. |
Abstract (ePrints, secondary language): |
In the thesis I analyzed some prices of construction works from 1950s and did a cost analysis of building a super levee. Earth and concrete dams, percolation through the core of the embankment and foundation seepage beneath the dykes are presented in details. Much attention is given to the construction and use of new types of dams such as super-levees. Furthermore, the analysis of changing prices of some construction works are presented as the costs are important in the building of levees. The analyses of super-levees buildidng price changes for 63 years are presented, including the variability in the land prices, costs of soil excavations, price of sided notes, installation of reinforcement, concrete and humusation and green cover. In the last part of theisis an analysis of the cost of construction of three classis dams dimensioned for different flow rates and a comparison with the great dam built on the same work site was done. |
Keywords (ePrints, secondary language): |
flood;levee;super levee;construction work prices;cost analysis |
ID: |
8313037 |