magistrsko delo
Marjan Strašek (Author), Iztok Palčič (Mentor), Zlatko Nedelko (Mentor)

Abstract

V magistrskem delu smo se ukvarjali z rekonstrukcijo montažne linije. Razlog za rekonstrukcijo montažne linije predstavljata nenadno povečanje povpraševanja po izbranih izdelkih in uvajanje novega izdelka v proizvodnjo. V magistrskem delu smo najprej analizirali obstoječe stanje montažne linije, pri čemer smo si pomagali s snemanjem. Rezultat magistrskega dela so optimizirana delovna mesta in optimalna postavitev linije glede na dan prostor, ki je bil v proizvodnji na razpolago. Proizvodni prostor podjetja je po rekonstrukciji bolje izkoriščen, montažna linija je bolj fleksibilna, saj lahko sedaj podjetje izdeluje istočasno dva različna izdelka. Prav tako smo z razmestitvijo operacij znižali takt linije in povečali proizvodnjo za 130 izdelkov na dan.

Keywords

rekonstrukcija;optimiranje;operacija;delovno mesto;takt;normativni čas;montaža;magistrske naloge;

Data

Language: Slovenian
Year of publishing:
Typology: 2.09 - Master's Thesis
Organization: UM FS - Faculty of Mechanical Engineering
Publisher: [M. Strašek]
UDC: 658.511.3:658.515(043.2)
COBISS: 20438038 Link will open in a new window
Views: 851
Downloads: 44
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Reconstruction of the assembly line in the Eurel company
Secondary abstract: This master's thesis deals with the reconstruction of an assembly line. The reason for the reconstruction lies in a sudden rise in demand for selected products and the introduction of a new product in the production process. The master's thesis first analyses the current condition of the assembly line with the help of video recordings. The goal is to optimise the job posts and ensure optimal layout of the line considering the available space. Since the reconstruction the company's production area has been utilised more efficiently. The assembly line is more flexible and enables the company to produce two different products simultaneously. Moreover, the new configuration of operations reduced the line's tact time and increased the number of products made per day to 130.
Secondary keywords: reconstruction;optimization;operation;workstation;tact;normative time;assembly;
URN: URN:SI:UM:
Type (COBISS): Master's thesis/paper
Embargo end date (OpenAIRE): 2019-11-20
Thesis comment: Univ. v Mariboru, Fak. za strojništvo, Gospodarsko inženirstvo
Pages: XI, 52 str.
ID: 9214828
Recommended works:
, diplomsko delo visokošolskega strokovnega študija Organizacija in management delovnih procesov
, diplomsko delo visokošolskega strokovnega študija Organizacija in management poslovnih in delovnih sistemov