Jezik: | Slovenski jezik |
---|---|
Leto izida: | 2016 |
Tipologija: | 2.09 - Magistrsko delo |
Organizacija: | UM FS - Fakulteta za strojništvo |
Založnik: | [M. Strašek] |
UDK: | 658.511.3:658.515(043.2) |
COBISS: | 20438038 |
Št. ogledov: | 851 |
Št. prenosov: | 44 |
Ocena: | 0 (0 glasov) |
Metapodatki: |
Sekundarni jezik: | Angleški jezik |
---|---|
Sekundarni naslov: | Reconstruction of the assembly line in the Eurel company |
Sekundarni povzetek: | This master's thesis deals with the reconstruction of an assembly line. The reason for the reconstruction lies in a sudden rise in demand for selected products and the introduction of a new product in the production process. The master's thesis first analyses the current condition of the assembly line with the help of video recordings. The goal is to optimise the job posts and ensure optimal layout of the line considering the available space. Since the reconstruction the company's production area has been utilised more efficiently. The assembly line is more flexible and enables the company to produce two different products simultaneously. Moreover, the new configuration of operations reduced the line's tact time and increased the number of products made per day to 130. |
Sekundarne ključne besede: | reconstruction;optimization;operation;workstation;tact;normative time;assembly; |
URN: | URN:SI:UM: |
Vrsta dela (COBISS): | Magistrsko delo/naloga |
Konec prepovedi (OpenAIRE): | 2019-11-20 |
Komentar na gradivo: | Univ. v Mariboru, Fak. za strojništvo, Gospodarsko inženirstvo |
Strani: | XI, 52 str. |
ID: | 9214828 |