diplomska naloga
Abstract
Diplomsko delo analizira potek izgradnje poslovne stavbe s časovnega in stroškovnega vidika.
Izvedli smo časovno analizo in primerjavo med pogodbenim ter operativnim terminskim
planom in dejansko izvedbo gradbenega projekta od uvedbe v delo do primopredaje. Navedeni
so razlogi za odstopanja dejanskega izvajanja del od pogodbenega terminskega plana. Za izvajalca gradbenih del je nujno, da pri dejanski izvedbi sledi pogodbenemu terminskemu planu. Narejena je bila tudi stroškovna analiza za betonska, železokrivska, zidarska dela in opaževanje ter fasadne odre. V analizi je narejena primerjava med kalkulacijo, na podlagi ponudbenih cen, in pokalkulacijo, kjer so upoštevane dejanske cene vgrajenih količin. Na koncu so navedeni še razlogi za povišanje pogodbene cene pri projektu.
Keywords
gradbeništvo;diplomska naloga;gradbena pogodba;gradnja;terminski plan;kalkulacija;
Data
Language: |
Slovenian |
Year of publishing: |
2016 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UL FGG - Faculty of Civil and Geodetic Engineering |
Publisher: |
[J. Slemenšek] |
UDC: |
005.8:725.1(497.4)(043.2) |
COBISS: |
7823457
|
Views: |
3171 |
Downloads: |
549 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
Time and cost analysis of commercial building construction |
Secondary abstract: |
This thesis analyses the construction course of a commercial building from two aspects: time and cost. A time analysis and a comparison between a contract term plan and an executive term plan as well as the actual execution of the constructional project from the start of the construction until the handover and acceptance are being presented. Reasons for the deviation from the constructional work term plan are stated. It is of the uttermost importance for the contractor to follow the term plan stated in the construction contract. A cost analysis for concrete, metal and mason work, as well as panelling and scaffolding is performed. The analysis contains a comparison between an offer-based calculation and an after-calculation, which complies with the actual cost of used quantities. Reasons for the increase of the contract price of a project are stated at the end. |
Secondary keywords: |
graduation thesis;civil engineering;construction contract;construction;term plan;calculation; |
File type: |
application/pdf |
Type (COBISS): |
Undergraduate thesis |
Thesis comment: |
Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Pages: |
X, 54 str. |
ID: |
9234924 |