Language: | Slovenian |
---|---|
Year of publishing: | 2011 |
Source: | Krško |
Typology: | 2.11 - Undergraduate Thesis |
Organization: | UM FE - Faculty of Energetics |
Publisher: | [B. Trop] |
UDC: | 621.311:699.865(043.2) |
COBISS: | 1024076380 |
Views: | 3086 |
Downloads: | 396 |
Average score: | 0 (0 votes) |
Metadata: |
Secondary language: | English |
---|---|
Secondary title: | ǂThe ǂoperation of unit 5 TEŠ after reconstruction of gas turbine |
Secondary abstract: | In my paper diploma are introduced two ways of unit 5 functioning. First: as independent functioning of steam unit, and second as combined gas steam process. There are described the basics of functioning of classical thermal power plant and gas power plant. In below is introduction of unit 5 and gas turbine PT51 and their basics characteristic. Also there is performed an efficiency calculation of unit 5 and of combined gas-steam facilities. Pursuant to calculation is confirmed the upgrading of gas turbine PT51 to unit 5. Beside the calculation of efficiency of unit 5, there are given recommendations for consistency reaching of those technologic parameters, which have the most influences on efficiency of power plant. |
Secondary keywords: | thermal power plant;steam boiler;steam turbine;gas turbine;efficiency; |
URN: | URN:SI:UM: |
Type (COBISS): | Bachelor thesis/paper |
Thesis comment: | Dipl. delo, Univ. Maribor, Fakulteta za energetiko |
Pages: | X, 73 f. |
Keywords (UDC): | applied sciences;medicine;technology;uporabne znanosti;medicina;tehnika;engineering;technology in general;inženirstvo;tehnologija na splošno;mechanical engineering in general;nuclear technology;electrical engineering;machinery;strojništvo;electrical engineering;elektrotehnika;applied sciences;medicine;technology;uporabne znanosti;medicina;tehnika;building (construction) trade;building materials;building practice and procedure;gradbeništvo;gradbeni materiali;gradbene obrti in dela; |
ID: | 990441 |