Jezik: | Slovenski jezik |
---|---|
Leto izida: | 2011 |
Izvor: | Krško |
Tipologija: | 2.11 - Diplomsko delo |
Organizacija: | UM FE - Fakulteta za energetiko |
Založnik: | [B. Trop] |
UDK: | 621.311:699.865(043.2) |
COBISS: | 1024076380 |
Št. ogledov: | 3086 |
Št. prenosov: | 396 |
Ocena: | 0 (0 glasov) |
Metapodatki: |
Sekundarni jezik: | Angleški jezik |
---|---|
Sekundarni naslov: | ǂThe ǂoperation of unit 5 TEŠ after reconstruction of gas turbine |
Sekundarni povzetek: | In my paper diploma are introduced two ways of unit 5 functioning. First: as independent functioning of steam unit, and second as combined gas steam process. There are described the basics of functioning of classical thermal power plant and gas power plant. In below is introduction of unit 5 and gas turbine PT51 and their basics characteristic. Also there is performed an efficiency calculation of unit 5 and of combined gas-steam facilities. Pursuant to calculation is confirmed the upgrading of gas turbine PT51 to unit 5. Beside the calculation of efficiency of unit 5, there are given recommendations for consistency reaching of those technologic parameters, which have the most influences on efficiency of power plant. |
Sekundarne ključne besede: | thermal power plant;steam boiler;steam turbine;gas turbine;efficiency; |
URN: | URN:SI:UM: |
Vrsta dela (COBISS): | Diplomsko delo/naloga |
Komentar na gradivo: | Dipl. delo, Univ. Maribor, Fakulteta za energetiko |
Strani: | X, 73 f. |
Ključne besede (UDK): | applied sciences;medicine;technology;uporabne znanosti;medicina;tehnika;engineering;technology in general;inženirstvo;tehnologija na splošno;mechanical engineering in general;nuclear technology;electrical engineering;machinery;strojništvo;electrical engineering;elektrotehnika;applied sciences;medicine;technology;uporabne znanosti;medicina;tehnika;building (construction) trade;building materials;building practice and procedure;gradbeništvo;gradbeni materiali;gradbene obrti in dela; |
ID: | 990441 |