Jezik: | Slovenski jezik |
---|---|
Leto izida: | 2017 |
Tipologija: | 2.11 - Diplomsko delo |
Organizacija: | UL FGG - Fakulteta za gradbeništvo in geodezijo |
Založnik: | [K. Vodeb] |
UDK: | 628.33./.35(043.2) |
COBISS: | 8172897 |
Št. ogledov: | 2174 |
Št. prenosov: | 493 |
Ocena: | 0 (0 glasov) |
Metapodatki: |
Sekundarni jezik: | Angleški jezik |
---|---|
Sekundarni naslov: | Comparison of the existing mechanical-biological wastewater treatment with the wastewater treatment plant |
Sekundarni povzetek: | Scattered settlements in Slovenia are the main reason why the connection of houses to public water supply and sewage system is often difficult. As a result, many houses do not have regulated sewerage system and the occupants have to arrange the cleaning of the waste waters themselves. This thesis was made to compare cleaning waste-waters with mechanical-biological wastewater treatment and treatment plant. The case was made on the specific example of one one-dwelling house. The purpose of this comparison is to determine whether is the plant cleaning machine more optimal than the mechanical-biological cleaning machine in terms of water purification, cost, durability, layout and preparation of the terrain. The thesis is based upon the existing dwelling-house and an already existing ProSigma wastewater treatment. |
Sekundarne ključne besede: | graduation thesis;civil engineering;the mechanical-biological wastewater treatment;ProSigma;treatment plant;the single-family house; |
Vrsta dela (COBISS): | Diplomsko delo/naloga |
Študijski program: | 0 |
Komentar na gradivo: | Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Strani: | XI, 37 str. |
ID: | 10909826 |