magistrsko delo
Povzetek
Luke Koper, zato je predvidena gradnja 2. tira Divača - Koper. Projekt vključuje tudi izgradnjo t.i. izvlečnega tira iz Luke, skupne dolžine 1,2 km. Ta poteka po nasipu na mehkih tleh. Med gradnjo se pogosto zgodi, da so geotehnične razmere drugačne od projektno predvidenih. Večina vzrokov za "geološko-geotehnična presenečenja" se skriva v kvaliteti in premajhnem obsegu geološko geotehničnih raziskav, da bi opisali celotno geološko sestavo tal ter v neustrezni interpretaciji rezultatov meritev. V magistrskem delu smo izvedli povratno geološko geotehnično analizo nasipa za izvlečni tir in reinterpretacijo podatkov terenskih meritev. Dobljene rezultate smo primerjali s podatki, ki jih navaja geološko-geotehnični elaborat. Vrednotili smo rezultate statičnega konusnega penetrometra, dilatometra in laboratorijskih preiskav ter ugotavljali skladnost interpretacije. Na podlagi primerjave velikosti posedkov in časa konsolidacije izdelanega računskega modela z izračuni v projektni dokumentaciji smo ocenili ali je bil projekt izveden varno, skladno z napovedmi in racionalno. Za analizo stanja nasipa po izgradnji smo vrednotili rezultate posedkov, ki so bili izmerjeni s horizontalnimi inklinometri.
Ključne besede
gradbeništvo;magistrska dela;DMT;CPT;posedki;stabilnost;horizontalni inklinometri;
Podatki
Jezik: |
Slovenski jezik |
Leto izida: |
2018 |
Tipologija: |
2.09 - Magistrsko delo |
Organizacija: |
UL FGG - Fakulteta za gradbeništvo in geodezijo |
Založnik: |
[K. Ponikvar] |
UDK: |
624.136.2(497.4Luka Koper)(043.3) |
COBISS: |
8324705
|
Št. ogledov: |
1700 |
Št. prenosov: |
1305 |
Ocena: |
0 (0 glasov) |
Metapodatki: |
|
Ostali podatki
Sekundarni jezik: |
Angleški jezik |
Sekundarni naslov: |
Geotechnical analysis of the embankment for the service track from Luka Koper |
Sekundarni povzetek: |
To increase the capacity of the railway Divača - Prešnica - Koper, which in the future will no longer satisfy the needs of Luka Koper, the construction of the 2nd railway track Divača - Koper is planned. The project includes the construction of a service track, with a total length of 1.2 km. Part of the track runs on the embankment, which is the subject of this master's thesis. Often happens that geotechnical conditions at the construction site are different from the projected ones. The main causes of "geological-geotechnical surprises" are the inadequate quantity and quality of geological geotechnical investigation and wrong interpretation of the results. In the thesis reverse geological geotechnical analysis of the embankment and reinterpretation of measurements was performed. The obtained results were compared with the data provided by the geological- geotechnical design. Based on the comparison of the cone penetration test, flat dilatometer test and laboratory test results, we found out in which case the individual test gives inadequate result. The settlements and consolidation time of the material model was compared with the data in the project documentation, to determine if the project was implemented safely, rationally and according to the prognosis. In order to analyze the embankment after the construction, we evaluate the settlements that were measured with horizontal inclinometers. |
Sekundarne ključne besede: |
civil engineering;masters thesis;DMT;CPT;settlements;stability;horizontal inclinometers; |
Vrsta dela (COBISS): |
Magistrsko delo/naloga |
Študijski program: |
0 |
Konec prepovedi (OpenAIRE): |
1970-01-01 |
Komentar na gradivo: |
Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Strani: |
IX, 87 str., 5 pril. |
ID: |
10915336 |