diplomsko delo
Povzetek
Zaradi slabega gospodarjenja z infrastrukturo je veliko mostov v slabem stanju in potrebnih celovite sanacije. Sanacija mostov je zelo zahteven proces, ki terja veliko znanja vseh udeleženih v postopku sanacije. Zelo pomembno je, da je projekt sanacije pripravljen temeljito. V diplomskem delu bomo v prvem delu podrobno predstavili stanje poškodovanosti mostu, analizirali napake oz. poškodbe ter določili vzroke za njihov nastanek. V nadaljevanju bodo predstavljeni rezultati in postopki raziskav in raziskovalnih metod, ki so osnova za izdelavo projekta sanacije. Dotaknili se bomo tudi vseh postopkov sanacij, ki so bili izvedeni na obravnavanem mostu. V zadnjem poglavju bomo govorili o alternativnih postopkih sanacije, ki bi se lahko izvedli, da bi bila sanacija kvalitetneje izvedena.
Ključne besede
most;analiza poškodb;sanacija poškodb;konstrukcija;diplomske naloge;
Podatki
Jezik: |
Slovenski jezik |
Leto izida: |
2018 |
Tipologija: |
2.11 - Diplomsko delo |
Organizacija: |
UM FGPA - Fakulteta za gradbeništvo, prometno inženirstvo in arhitekturo |
Založnik: |
[A. Skornšek] |
UDK: |
69.059.25:624.21(043.2) |
COBISS: |
21667350
|
Št. ogledov: |
983 |
Št. prenosov: |
109 |
Ocena: |
0 (0 glasov) |
Metapodatki: |
|
Ostali podatki
Sekundarni jezik: |
Angleški jezik |
Sekundarni naslov: |
Reconstruction of the bridge over river Paka in Rečica ob Paki |
Sekundarni povzetek: |
Due to poor infrastructure management, many bridges are in poor condition and in need of complete sanation. This process is very demanding and requires a lot of knowledge of all involved in the sanation and it is very important that the project is prepered thoroughly. In the firs part of the diploma paper we will present in details the situation of damaged bridge, analyze the errors, damages and determine the causes for their occurrence. Below are the results and procedures of research and research methods that are the basis fort he elaboration of the sanation project. We will also discuss all the remediation procedures that were carried out on the bridge under consideration. In the last chapter we will talk about alternative sanation procedures that could be carried out to make the sanation even better. |
Sekundarne ključne besede: |
bridge;analyzing the injuries;repair of the damage;construction; |
URN: |
URN:SI:UM: |
Vrsta dela (COBISS): |
Diplomsko delo/naloga |
Komentar na gradivo: |
Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo, Gradbeništvo |
Strani: |
XII, 52 f., [7] zganj. pril. z načrti |
ID: |
10939864 |