zaključna naloga Univerzitetnega študijskega programa I. stopnje Strojništvo
Povzetek
V zaključni nalogi je predstavljen proces, kjer smo optimizirali sestavljanje gumijastega in plastičnega polizdelka. V teoretičnih osnovah je predstavljena uporabljena metoda PokaYoke, v eksperimentalnem delu pa celoten potek optimizacije procesa. Predstavljen je postopek ter analiza obstoječega stanja, pri katerem je takt sestavljanja glede na življenjsko dobo projekta predolg. Zato se podamo v zasnovo naprave, s katero bi takt izdelave skrajšali. Predstavljene so omejitve za izdelavo, idejna zasnova ter postopek izdelave nove montažne naprave vključno s preračunom stroškov, potekom konstruiranja ter odpravljanjem napak. S polavtomatsko montažno napravo, ki deluje po zgledu metode Poka-Yoke, uspešno optimiziramo proces ter tako privarčujemo več kot 4.500 ur v življenjski dobi projekta.
Ključne besede
diplomske naloge;optimizacija;avtomatizacija;proizvodni procesi;montaža elementov;Poka-Yoke;
Podatki
Jezik: |
Slovenski jezik |
Leto izida: |
2018 |
Tipologija: |
2.11 - Diplomsko delo |
Organizacija: |
UL FS - Fakulteta za strojništvo |
Založnik: |
[K. Janša] |
UDK: |
658.512.2:628.8(043.2) |
COBISS: |
16245019
|
Št. ogledov: |
1198 |
Št. prenosov: |
358 |
Ocena: |
0 (0 glasov) |
Metapodatki: |
|
Ostali podatki
Sekundarni jezik: |
Angleški jezik |
Sekundarni naslov: |
Process optimization mouting air-condition shock absorber |
Sekundarni povzetek: |
In the present degree paper a process where we optimized fitting rubber and plastic intermediate product is presented. In the theorethical part of the degree, a Poka-Yoke method is presented, which we also use later in the task. The experimental part shows a complete proccess of optimization. We present the procedure and analysis of a current state, in which the duration of mounting of rubber and plastic parts according to duration of the whole project is too long. The solution for reducing the mounting duration is in developement of a new mounting device. The limits and ideas for designing the device, the procedure of building a new machine including the calculated costs, constructing procedures and elimination of the errors are shown. The optimization of the procces is succesfully carried out with the half-automatic mounting device, which works in the wake of Poka-Yoke method. With it, we save more than 4.500 hours in the process of the project. |
Sekundarne ključne besede: |
optimization;automation;production processes;mounting elements;Poka-Yoke; |
Vrsta dela (COBISS): |
Zaključna naloga |
Študijski program: |
0 |
Konec prepovedi (OpenAIRE): |
1970-01-01 |
Komentar na gradivo: |
Univ. v Ljubljani, Fak. za strojništvo |
Strani: |
XIV, 36 f. |
ID: |
10956125 |