diplomska naloga
Povzetek
Informacijsko modeliranje gradenj (BIM) je tehnologija, s katero načrtujemo, gradimo ter upravljamo gradbene procese in objekte. Namen diplomske naloge je bil ugotoviti odstopanja med količinami pridobljenih iz modela BIM in količinami iz popisa del. Ob primerjavi popisnih količin večstanovanjske stavbe, smo ugotavljali, ali lahko informacijski model nadomesti klasični popis del. Uvodni del vključuje predstavitev tehnologije BIM, njeno uporabo, pomen, vlogo državnih institucij pri implementaciji. Opisani so tudi pričakovani pozitivni učinki tehnologije BIM pri javnem naročanju. V praktičnem delu naloge je predstavljena primerjava količin večstanovanjske stavbe, pridobljenih s pomočjo popisa del in informacijskega modela. Količine smo med seboj primerjali in s pomočjo 2D modela ugotavljali tudi natančnost modela BIM.
Ključne besede
gradbeništvo;diplomska naloga;UNI;VOI;B-VOI;BIM;popis del;izvoz količin;primerjava količin;
Podatki
Jezik: |
Slovenski jezik |
Leto izida: |
2019 |
Tipologija: |
2.11 - Diplomsko delo |
Organizacija: |
UL FGG - Fakulteta za gradbeništvo in geodezijo |
Založnik: |
M. Lahne] |
UDK: |
004.2:728.2(043.2) |
COBISS: |
8903777
|
Št. ogledov: |
762 |
Št. prenosov: |
178 |
Ocena: |
0 (0 glasov) |
Metapodatki: |
|
Ostali podatki
Sekundarni jezik: |
Angleški jezik |
Sekundarni naslov: |
Multi-dwelling building bill of quantities estimation using building information modelling |
Sekundarni povzetek: |
Building Information Modelling, is a technology by which we design, build, and manage construction processes and structures. The purpose of this final paper was to identify discrepancies between the quantities obtained from the BIM and the quantities from the bill of quantities. By comparing the quantities of the multi-dwelling building, we tried to determine whether the information model could replace the classical bill of quantities. The opening part includes introduction of BIM technology, its use, and importance in public institutions for its implementation. The main part of the final paper also describes the benefits of using BIM technologies in public procurement. The practical part of the thesis presents a comparison of the quantities of a multi-dwelling building obtained through the bill of quantities and the building information modelling. The quantities were compared and the accuracy of the BIM was determined using the 2D model. |
Sekundarne ključne besede: |
graduation thesis;civil engineering;BIM;bill of quantities;quantity takeoff;quantity estimation; |
Vrsta dela (COBISS): |
Diplomsko delo/naloga |
Študijski program: |
0 |
Konec prepovedi (OpenAIRE): |
1970-01-01 |
Komentar na gradivo: |
Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Strani: |
VI, 39 str., [18] str. pril. |
ID: |
11228303 |