magistrsko delo - 2. stopnja
Jaša Saražin (Avtor), Igor Potočnik (Mentor), Anton Poje (Komentor)

Povzetek

V magistrski nalogi je celostno prikazana tematika protipožarnih presek, od analize prometnega omrežja, pa do projekta nove protipožarne preseke. Najprej je bilo analizirano celotno prometno omrežje, z namenom zagotavljanja protipožarne varnosti na območju raziskave. To območje je zajemalo del požarno ogrožene površine Južne Primorske na površini 47.936 ha. Rezultati dobljeni iz v naprej pridobljenega kartnega materiala so bili korigirani upoštevajoč nove podatke, ki so bili pridobljeni s terenskim vzorčenjem. Upoštevajoč zgolj kartni material, je relativna odprtost območja znašal 63 %, kar se smatra kot nezadostno. Zadovoljiva odprtost (80 %) je bila dosežena šele z upoštevanjem korigiranih vrednosti. Težava dodatno posnetih prometnic se pa je pokazala v temu, da so le te slabše umeščene v prostor za potrebe protipožarnega varstva. Pri preverjanju kartnega materiala, z vidika prevoznosti posameznih kategorij prometnic za namenska vozila, se je izkazalo, da je zgolj na podlagi kartnega materiala težko optimalno razporediti namenska vozila po prostoru. Za zadovoljivo mejo je bila postavljena 95 % možnost dostopa. Javne ceste so lahko zagotovile dostop vsem vozilom v 90 % primerov, protipožarne preseke I kategorije vsem svojim namenskim vozilom v 82 %, medtem ko protipožarne preseke II kategorije vsem svojim namenskim vozilom v 92 %. Po drugi strani pa so bile nižje kategorizirane prometnice pogosto zmožne sprejeti večja vozila, kar je prav tako moteče pri racionalnem odločanju. V nadaljevanju je bilo izpostavljeno eno prednostno območje odpiranja ter v njem načrtovani dve varianti novih protipožarnih presek. Na podlagi večkriterialnega primerjanja je bila izbrana boljša varianta in izdelan projekt za izgradnjo njenega dela v dolžini 1417 m. Izbrana varianta odpira 25,81 ha do sedaj neodprtih površin ter izboljšuje relativno odprtost prednostnega območja za večja namenska vozila iz 7,9 % na 30,8 %.

Ključne besede

protipožarne preseke;gozdne ceste;projektiranje;načrtovanje;cestno omrežje;gozdni požari;

Podatki

Jezik: Slovenski jezik
Leto izida:
Tipologija: 2.09 - Magistrsko delo
Organizacija: UL BF - Biotehniška fakulteta
Založnik: [J. Saražin]
UDK: 630*68:630*43(043.2)=163.6
COBISS: 3907750 Povezava se bo odprla v novem oknu
Št. ogledov: 479
Št. prenosov: 125
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: Fire preventions roads in area of south Primorska
Sekundarni povzetek: In this master thesis is fully presented fire prevention roads topic; from its road network analyses, till project of the new fire prevention road. Firstly whole road network, which can be used for fire prevention purpose in our research area was analyzed. This area covers a part of fire endangered land of South Primorska on total area of 47.936 ha. Results obtained from official map material were corrected with new data, obtained with field work. Considerating only official map material gave us insufficient relative openness (63 %) of the area. While considering corrected values, with non mapped roads, relative openness appeared to be satisfactory (80 %). The highlighted problem of additionally digitalized roads was that those were much worse placed in area for fire prevention purpose. Secondly the transportability of categories in map material for groups of assigned vehicles were checked. Results appeared, while relating only on official map material, vehicles can%t be optimally located around the area. 95 % transportability was set as sufficient. Public roads could provide approach to all vehicles in 90 %, fire prevention roads of category I to all of their assigned vehicles in 82 %, fire prevention roads of category II to all of their assigned vehicles in 92 %. On the other hand, lower categorized roads were often able to provide access to bigger vehicles, which also presents a distraction while undertaking rational decisions. At the end one priority area of opening was focused and there we planned two variants of new fire prevention roads. On base of multi-criteria comparison, decision for better variant was made and a project for its construction in total length of 1417 m prepared. Chosen variant opens 25,81 ha of closed areas and it improves relative openness of priority area for bigger assigned vehicles from 7,9 % to 30,8 %.
Vrsta dela (COBISS): Magistrsko delo/naloga
Komentar na gradivo: Univ. v Ljubljani, Biotehniška fakulteta, Oddelek za gozdarstvo in obnovljive gozdne vire
Strani: 87 str., [14] f. pril.
ID: 11574291
Priporočena dela:
, magistrsko delo - 2. stopnja
, letno (vmesno) poročilo o rezultatih raziskovalnega projekta v letu 2000
, letno poročilo o rezultatih raziskovalnega projekta v letu 1999
, zaključno poročilo o rezultatih raziskovalnega projekta v letu 2001