diplomska naloga
Andraž Dimc (Avtor), Božo Koler (Mentor), Tilen Urbančič (Komentor)

Povzetek

V diplomski nalogi je obravnavana izmera poligona in določitev koordinat merskih točk v Antonijevem rovu v Idriji za umestitev rova v državni koordinatni sistem. Na podlagi izmere poligona in trigonometričnega višinomerstva smo za določitev koordinat merskim točkam ločeno izvedli višinsko in horizontalno izravnavo geodetske mreže. Poligon smo navezali na predhodno vzpostavljeno mikromrežo pred vhodom v rov, sestavljeno iz treh točk. Z izravnavo opazovanj smo dosegli nekaj milimetrsko natančnost, ki je glede na namen naše izmere zadovoljiva. Poleg same določitve koordinat merskim točkam in prikaza poteka rova smo vzpostavili tudi geodetsko osnovo za možnost izmere z drugimi tehnologijami, kot je na primer terestrično lasersko skeniranje.

Ključne besede

geodezija;diplomska naloga;VSŠ;TUN;Antonijev rov;potek rova;državni koordinatni sistem;D96/TM;SVS2010;girusna metoda;trigonometrično višinomerstvo;izravnava geodetske mreže;

Podatki

Jezik: Slovenski jezik
Leto izida:
Tipologija: 2.11 - Diplomsko delo
Organizacija: UL FGG - Fakulteta za gradbeništvo in geodezijo
Založnik: [A. Dimc]
UDK: 528.236(497.4Idrija)(043.2)
COBISS: 44793603 Povezava se bo odprla v novem oknu
Št. ogledov: 585
Št. prenosov: 188
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: Placement of the mine tunnel "Antonijev rov" in Idrija in the national coordinate system
Sekundarni povzetek: This diploma describes the measurement of the polygon and the determination of the coordinates of the measurement points in the mine tunnel %Antonijev rov% in Idrija for placement of the mine tunnel into the national coordinate system. Polygon measurement was based by the girus method and trigonometric levelling. The coordinate determination was based separated to vertical and horizontal components. Polygon was connected to a pre-established micro-network of three points outside the mine tunnel. By adjustment we have achieved a few millimetres accuracy, which is appropriate according to the purpose of our measurements. In addition to determining the coordinates and displaying the course of the mine tunnel we have also established a geodetic basis for the possibility of measuring with other technologies such as terrestrial laser scanning.
Sekundarne ključne besede: geodesy;graduation thesis;the mine tunnel;Antonijev rov;the course of the mine tunnel;national coordinate system;D96/TM;SVS2010;girus method;trigonometric levelling;network adjustment;
Vrsta dela (COBISS): Diplomsko delo/naloga
Študijski program: 0
Konec prepovedi (OpenAIRE): 1970-01-01
Komentar na gradivo: Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo
Strani: XVI, 23 str., [62] str. pril.
ID: 11901362