Arhitektura, inženirstvo in gradbeništvo v zadnjih desetljih beležijo nizko rast produktivnosti. Z eksponentno rastjo količine podatkov želi gradbeni sektor vzpostaviti stik z boljšim upravljanjem projektnih informacij, kar izpostavlja in udejanja informacijsko modeliranje zgradb (angl. building information model - BIM). Obstaja širok nabor metodologij in protokolov za upravljanje s podatki, ki jih lahko obravnavamo pod pojmom poslovne inteligence. Uporabnost in razvoj tega področja v gradbeništvu je še vedno v začetnih fazah. Pristopi poslovne inteligence so bili zasnovani za druge industrije, njihove značilnosti in izzive. Uporaba poslovne inteligence v točno določeni industriji, kot je gradbeništvo, zato ahteva ustrezne prilagoditve, še posebej v primeru če poslovni inteligenci temelji na pristopu BIM. Pričujoče delo obravnava sinergije, ki jih je mogoče doseči pri uporabi poslovne inteligence (angl. Business intelligence - BI) in uporabi podatkov iz modelov BIM, pri čemer želimo zatgotoviti prilagojene rezultate glede na posebnosti gradbene industrije. Študija vključuje pregled literature, na osnovi katere je predlagana zasnova podatkovnega centra za poslovno inteligenco v gradbeni industriji. Temeljit pregled rešitev vodi do konceptov, ki nudijo okvir za vspostavitev procedur za boljše upravljanje projektnih informacij v gradbeništvu.

Ključne besede

civil engineering;master thesis;BIM;business intelligence;data warehouse;schedule optimization;data visualization;AEC industry;

Podatki

Jezik: Angleški jezik
Leto izida:
Tipologija: 2.09 - Magistrsko delo
Organizacija: UL FGG - Fakulteta za gradbeništvo in geodezijo
Založnik: [J. B. R. G. Vieira]
UDK: 004.9:624(043.3)
COBISS: 39021315 Povezava se bo odprla v novem oknu
Št. ogledov: 496
Št. prenosov: 137
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Slovenski jezik
Sekundarni naslov: Podatkovni center za poslovno inteligenco v gradbeništvu
Sekundarni povzetek: The Architecture, Engineering, and Construction Industry have seen a relatively low increase in the efficiency rates over the recent decades, and the data management is still trying to catch up with the exponential data growth in the sector, both emphasized and embodied by BIM. There is a plethora of methodologies and routines for data management kept under the Business Intelligence umbrella; however, the usability of these tools in the AEC Industry is under development. These concepts were design for other sectors, their characteristics, and challenges, to adopt such tools require tailoring and should embrace the leading trend in the industry: BIM. This study looks at the synergy that is possible due to the overlapping benefits in applying established BI%s technologies and BIM data while assuring a tailored result by putting the peculiarities of the business in the spotlight while building around it. The study is a Literature review that aims to develop a routine for implementing a Business Intelligence Data Center for the Construction Industry. It looks at past research studies that have investigated similar issues for other industries. The sharp look at these studies shows how these two concepts can be combined and, then, proposes a data management routine for more integrated information flow in construction.
Sekundarne ključne besede: gradbeništvo;magistrska dela;GR;BIM;poslovna inteligenca;podatkovna skladišča;optimazacija terminskih planov;vizualizacija podatkov;arhitektura in inženirstvo;
Vrsta dela (COBISS): Magistrsko delo/naloga
Študijski program: 0
Konec prepovedi (OpenAIRE): 1970-01-01
Komentar na gradivo: Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo
Strani: XII, 43 str.
ID: 11935548
Priporočena dela:
, master thesis no.: 154/II. GR-BIM
, master thesis No.: 151/II. GR-BIM
, magistrsko delo Management informacijskih sistemov, Sistemi za podporo odločanju
, master thesis No.: 164/II. GR-BIM
, master thesis No.: 150/II. GR-BIM