Sekundarni jezik: |
Angleški jezik |
Sekundarni naslov: |
Methodology of traffic calming measures |
Sekundarni povzetek: |
Due to increase of traffic, roads have been widened and straightened to accommodate more and faster vehicle traffic. These changes facilitate driving but often degrade conditions for walking and cycling. Traffic calming is the name for road design strategies to reduce vehicle speed and volumes. There are many potential traffic calming strategies, some are indicated in technical specifications for traffic calming (TSC 03.800:2000). Due to new findings in demands in traffic calming these specifications should be updated or completely replaced. Two of the main problems are solved in this paper. The first change is in the way the guidelines are presented and are now based on Danish example. More consideration has been given to the relation of traffic calming measures and traffic volumes. This connection has been implemented in guidelines. As a new mean of traffic calming, roundabout has been added. The effect off each traffic calming measure is based on before-after studies, which were made in United States of America. This method is used to determine situation on the streets before and after implication of the traffic calming measure. The guidelines that are result of this paper are different than existing guidelines, which confirms my thesis, that the existing guidelines should be updated or completely replaced. |
Sekundarne ključne besede: |
methodology;measures;traffic calming;before-after;speed humps;narrowing; |
Vrsta datoteke: |
application/pdf |
Vrsta dela (COBISS): |
Diplomsko delo |
Komentar na gradivo: |
Univ. Ljubljana, Fakulteta za gradbeništvo in geodezijo, Univerzitetni študij gradbeništva, Prometna smer |
Strani: |
X, 83 f. |
Vrsta dela (ePrints): |
thesis |
Naslov (ePrints): |
Metodologija ukrepov za umirjanje prometa |
Ključne besede (ePrints): |
gradbeništvo;diplomska dela;UNI;prometna smer;metodologija;ukrepi;umirjanje prometa;prej-potem;varnosthitrostna grbina;zamikanje osi;zoženje vozišča; |
Ključne besede (ePrints, sekundarni jezik): |
methodology;measures;traffic calming;before-after;speed humps;narrowing; |
Ključne besede (ePrints, sekundarni jezik): |
methodology;measures;traffic calming;before-after;speed humps;narrowing; |
ID: |
8310634 |