Conceptual solution of drainage and wastewater treatment for the settlement Grgar |
Sekundarni povzetek: |
This thesis presented a project of drainage of wastewater and rainwater regulation for the village Grgar. There are describe and design also waste water treatment as process SBR and natural wastewater treatment. Described are all planning processes, guidelines for the design and the factors and conditions that need to be taken into account in planning. Rain water and waste water sewage are dimensioned by using a program Sewer + 2010. In my thesis I have done comparative economic analysis of the investment and operation of both systems for treatment. After analyzing the results, I selected method of treatment and compared to the investment of the Municipality of Nova Gorica in the project Protection of the water source Mrzlek. |
Sekundarne ključne besede: |
graduation thesis;sewer system for watewater and for rain water;hydraulic dimensioning;SBR watewater treatment system;natural wastewater treatment system; |
Vrsta datoteke: |
application/pdf |
Vrsta dela (COBISS): |
Diplomsko delo |
Komentar na gradivo: |
Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Strani: |
X, 88 str., [48] f. pril. |
Vrsta dela (ePrints): |
thesis |
Naslov (ePrints): |
Conceptual solution of drainage and wastewater treatment for the settlement Grgar |
Ključne besede (ePrints): |
Grgar;kanalizacija za odpadno vodo;padavinska kanalizacija;hidravlično dimenzioniranje;SBR čistilna naprava;rastlinska čistilna naprava |
Ključne besede (ePrints, sekundarni jezik): |
Grgar;sewer system for watewater and for rain water;hydraulic dimensioning;SBR watewater treatment system;natural wastewater treatment system |
Povzetek (ePrints): |
V diplomskem delu je predstavljeno načrtovanje odvodnje odpadnih in padavinskih voda v naselju Grgar. Opisano in dimenzionirano je tudi čiščenje odpadnih voda po šaržnem SBR postopku in z rastlinsko čistilno napravo. Opisani so vsi postopki načrtovanja, izhodišča za zasnovo ter dejavniki in določila, ki jih je potrebno upoštevati pri načrtovanju kanalizacije in čistilne naprave. Padavinska in kanalizacija za odpadno vodo sta dimenzionirani s pomočjo programa Sewer+ 2010. V diplomskem delu sem izvedel tudi primerjalno ekonomsko analizo stroškov investicije in obratovanja za oba sistema čiščenja. Po analizi rezultatov sem izbran način čiščenja primerjal še z investicijo občine Nova Gorica v projektu Varovanja vodnega vira Mrzlek. |
Povzetek (ePrints, sekundarni jezik): |
This thesis presented a project of drainage of wastewater and rainwater regulation for the village Grgar. There are describe and design also waste water treatment as process SBR and natural wastewater treatment. Described are all planning processes, guidelines for the design and the factors and conditions that need to be taken into account in planning. Rain water and waste water sewage are dimensioned by using a program Sewer + 2010. In my thesis I have done comparative economic analysis of the investment and operation of both systems for treatment. After analyzing the results, I selected method of treatment and compared to the investment of the Municipality of Nova Gorica in the project Protection of the water source Mrzlek. |
Ključne besede (ePrints, sekundarni jezik): |
Grgar;sewer system for watewater and for rain water;hydraulic dimensioning;SBR watewater treatment system;natural wastewater treatment system |