diplomsko delo
Matej Fridrih (Avtor), Borut Buchmeister (Mentor)

Povzetek

Pri uvajanju nove proizvodne linije se srečamo s številnimi organizacijskimi problemi. Pojavi se vprašanje, kako bomo postavili novo linijo, kakšne bodo naše kapacitete in ali bodo stroji zadostili našim pričakovanjem. V okviru diplomske naloge sem predstavil novo proizvodno linijo ČEP 6 in stroje v podjetju GKN Driveline Slovenija. Poudarek diplomskega dela je bil na načrtovanju preventivnega vzdrževanja strojev in opreme, njihovem uvajanju ter postavitvi le-teh na proizvodni liniji. Med fazo postavljanja proizvodne linije sem vključil veliko metod vitkega podjetja, katerih rezultati so racionalnejša in kakovostna proizvodnja. Te metode so Celovito produktivno vzdrževanje (TPM), Samostojno vzdrževanje (AM), Kaizen, Standardno delo (SW) in metoda 5s. S ciljem lažjega nadzora vzdrževanja so bila izdelana potrebna navodila in obrazci, ki bodo delavcem lajšali nadzor ter omogočili večji izkoristek proizvodne linije. Proces na liniji ČEP 6 bo v veliki meri avtomatiziran, kar bo pripomoglo k povečanju produktivnosti in nižjim stroškom procesa.

Ključne besede

uvajanje proizvodne linije;vzdrževanje;nadzor;avtomobilska polgred;diplomske naloge;

Podatki

Jezik: Slovenski jezik
Leto izida:
Tipologija: 2.11 - Diplomsko delo
Organizacija: UM FS - Fakulteta za strojništvo
Založnik: [M. Fridrih]
UDK: 658.51:629.3(043.2)
COBISS: 19142422 Povezava se bo odprla v novem oknu
Št. ogledov: 1147
Št. prenosov: 154
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: Introduction of new production line for making car component sideshaft
Sekundarni povzetek: When we introduce a new production line, we meet many problems with organizational character. The question arises how to set up a new line, what will be our capacity and while the machines meet our expectations. I presented a new production line and single machines in the company GKN Driveline Slovenija. I focused on the planning preventive maintenance of machinery and equipment, and installation of them selves on the production line. During the phase of production lines I have included many methods of lean enterprise, the results of which are rational and quality production. All this I connected through various methods, such as Total productive maintenance (TPM), Lean Enterprise, autonome maintenance (AM), kaizen and method 5s. With a view to facilitating supervision of maintenance have been made necessary instructions and forms, which will be facilitated for workers control and allow greater utilization of production lines. The process on line ČEP 6 will be largely automated, which will help to increase productivity and lower the cost of the process.
Sekundarne ključne besede: introduction of production line;maintenance;control;car sideshaft;
URN: URN:SI:UM:
Vrsta dela (COBISS): Diplomsko delo/naloga
Komentar na gradivo: Univ. v Mariboru, Fak. za strojništvo
Strani: XII, 38 f.
ID: 8887476