diplomsko delo
Povzetek
V diplomskem delu je opisan problem in izvedena analiza ter primerjava stroškov izdelave dvodelnega vodilnega obroča z dvema različnima postopkoma izdelave. Tema za diplomsko delo je povzeta iz praktičnega proizvodnega problema, pri katerem smo želeli izbrati najugodnejši postopek izdelave, zadostiti vsem zahtevam kupca, skrajšati proizvodni čas in nazadnje stroškovno optimirati proizvodni proces.
Osnova za diplomsko delo je bila nepopolna konstrukcija valjčnih transporterjev, na katerih se je zaradi odsotnega vodenja bremena pojavljalo zamikanje iz smeri gibanja, kar je imelo za posledico zastoje transportne linije.
Z delom smo uspešno dokazali, da lahko z dvema popolnoma različnima postopkoma dosežemo enake rezultate in da lahko z izbiro ustreznega postopka prihranimo čas ter denar. Za primerjavo med postopkoma struženja in globokega vleka je pomembno, da imamo v prvi vrsti znano število izdelkov, ker je postopek struženje primeren za individualno ali maloserijsko proizvodnjo, globoki vlek pa po drugi strani drastično zmanjša proizvodne stroške velikoserijske proizvodnje.
Ključne besede
tehnologije izdelave;dvodelni vodilni obroč;globoki vlek;struženje;primerjava postopkov;analiza stroškov izdelave;diplomske naloge;
Podatki
Jezik: |
Slovenski jezik |
Leto izida: |
2016 |
Tipologija: |
2.11 - Diplomsko delo |
Organizacija: |
UM FS - Fakulteta za strojništvo |
Založnik: |
[A. Timošek] |
UDK: |
621.941+621.983.3+657.478(043.2) |
COBISS: |
19746582
|
Št. ogledov: |
769 |
Št. prenosov: |
101 |
Ocena: |
0 (0 glasov) |
Metapodatki: |
|
Ostali podatki
Sekundarni jezik: |
Angleški jezik |
Sekundarni naslov: |
Comparison of manufacturing technology on example of production of two-part guiding ring |
Sekundarni povzetek: |
This thesis describes the problem and analysis of the costs of manufacturing of a two-part guiding ring, with two different manufacturing process. The theme of the thesis is solving a practical problem from production, in which we want to choose the best manufacturing process meet all customer requirements, shorten production times and ultimately cost-optimized of production process.
The basis for this work was incomplete construction of the roller conveyors, where, due to the construction error of guiding of transporting pallets – guiding has not been constructed, the direction of movement, resulting in operation delays and standstills of the conveyor line.
In this work, we have successfully prove, that there can be two completely different procedures in order to achieve the same results and by selecting the appropriate process it is possible to save time and money. In comparison between the procedures of turning and the deep drawing, it is important to have a correct information, final number of products, because the process of turning is suitable for individual or small-serial production, deep drawing, on the other hand drastically reduces the production costs of a large series production. |
Sekundarne ključne besede: |
manufacturing technology;a two-part guiding ring;deep-drawing;turning;comparison of operations;cost of manufacturing; |
URN: |
URN:SI:UM: |
Vrsta dela (COBISS): |
Diplomsko delo |
Komentar na gradivo: |
Univ. v Mariboru, Fak. za strojništvo |
Strani: |
XIV, 41 f. |
ID: |
9140871 |