| Jezik: | Slovenski jezik |
|---|---|
| Leto izida: | 2016 |
| Tipologija: | 2.11 - Diplomsko delo |
| Organizacija: | UL FGG - Fakulteta za gradbeništvo in geodezijo |
| Založnik: | [A. Brenko] |
| UDK: | 656.2(043.2) |
| COBISS: |
7768673
|
| Št. ogledov: | 2579 |
| Št. prenosov: | 520 |
| Ocena: | 0 (0 glasov) |
| Metapodatki: |
|
| Sekundarni jezik: | Angleški jezik |
|---|---|
| Sekundarni naslov: | Comparison of different railway line capacity calculation methods |
| Sekundarni povzetek: | In this graduation thesis I showed the differences between three methods for calculating the capacity of a railway. I used the following three methods: method UIC 406, method named after Kovaćević and method UIC 405. At first I described every method. After that I calculated the capacity of a railway for each method for the track Dobova –Zidani Most. In the end I compared the three methods and I justified why it came to differences in capacity. |
| Sekundarne ključne besede: | civil engineering;railway;capacity;timetable; |
| Vrsta datoteke: | application/pdf |
| Vrsta dela (COBISS): | Diplomsko delo/naloga |
| Komentar na gradivo: | Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
| Strani: | X, 37 str., 1 pril. |
| ID: | 9227905 |