diplomsko delo
Abstract
V diplomski nalogi je predstavljena organizacija gradbišča in terminsko planiranje hale Agroteh Vrbek v Šentjurju. Najprej je podan opis lokacije, funkcionalne zasnove in tehničnih značilnosti novega objekta. V drugem delu preučimo pogoje za gradnjo, kar zajema proučitev dokumentacije o lokaciji, gradbenega dovoljenja, gradbene pogodbe, razpoložljiva delovna sredstva, kadrovske možnosti, možnost nabave materiala ter organizacijske možnosti na lokaciji gradbišča. Tretji del obravnava organizacijo gradbišča, ki zajema opis gradbišča, dimenzioniranje začasnih objektov, deponij, inštalacij, popis pripravljalnih in zaključnih del ter shemo organizacije gradbišča. Zadnji del predstavlja terminsko planiranje gradnje objekta v obliki modificiranega gantograma in mrežnega diagrama.
Keywords
gradbeništvo;organizacija gradbišča;terminsko planiranje;diplomske naloge;
Data
Language: |
Slovenian |
Year of publishing: |
2018 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UM FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture |
Publisher: |
[D. Debelak] |
UDC: |
69.05+658.513(043.2) |
COBISS: |
21462038
|
Views: |
965 |
Downloads: |
305 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
Building site organization and construction time scheduling for facility Agroteh Vrbek in Šentjur |
Secondary abstract: |
The thesis presents the organization of construction site and a construction time scheduling for hall Agroteh Vrbek in Šentjur. First is a description of the location, functional concept and technical features of the new building. In the second part we are examing the condition for the construction, which include examination the documentation of location, building permit, construction contracts, available labor resources, possibility of human resources, possibility of purchasing material and organization possibilities at the location of the construction site. The third part deals with the organization of the construction site, which includes a description of the site, design of temporary structures, depots, installation, list of preparation and finishing works and site organization scheme. The last part represent construction time scheduling of construction in the form of modified grantt chart and network diagram. |
Secondary keywords: |
civil engineering;organization of the construction site;construction time scheduling; |
URN: |
URN:SI:UM: |
Type (COBISS): |
Bachelor thesis/paper |
Thesis comment: |
Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo, Gradbeništvo |
Pages: |
XI, 94 f., [4] zganj. pril. z načrti |
ID: |
10916705 |