diplomsko delo visokošolskega študijskega programa
Tomaž Kovač (Avtor), Uroš Klanšek (Mentor), Zoran Pučko (Komentor)

Povzetek

Diplomsko delo predstavlja organizacijo gradbišča in terminsko planiranje gradnje prizidka ob proizvodno-skladiščnem objektu Celjskih mesnin v Celju. Za potrebe diplome sem v prvem poglavju opredelil problem, določil namen in cilj diplomskega dela ter podal predvidene metode raziskovanja. V drugem poglavju sem opisoval splošne podatke o objektu, njegovi lokaciji, zasnovi ter opisal vse inštalacije. V poglavju organizacija gradbišča sem proučeval pogoje gradnje in dimenzioniral začasne objekte in napeljave. V zadnjem poglavju terminsko planiranje pa sem opisal vsa potrebna dela na gradbišču, njihov potek ter izdelal mrežni diagram ter gantogram.

Ključne besede

gradbeništvo;organizacija gradbišča;terminsko planiranje;diplomske naloge;

Podatki

Jezik: Slovenski jezik
Leto izida:
Tipologija: 2.11 - Diplomsko delo
Organizacija: UM FGPA - Fakulteta za gradbeništvo, prometno inženirstvo in arhitekturo
Založnik: [T. Kovač]
UDK: 005.936.2:69.05(043.2)
COBISS: 20766742 Povezava se bo odprla v novem oknu
Št. ogledov: 959
Št. prenosov: 192
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: Building site organization and construction time scheduling for an annex of production-storage object in Celje
Sekundarni povzetek: The diploma thesis presents the process of organising a construction site and time scheduling of construction of an extension next to the production and storage facility of Celjske mesnine in Celje. The first chapter of the diploma thesis defines the problem at hand, determines the purpose and the aim of the thesis and provides information on the anticipated research methods. The second chapter provides general information on the facility, its location, design and the installations it contains. The chapter dealing with construction site organisation examines the construction conditions and dimensioned temporary facilities and installations. The final chapter of the thesis discusses the time scheduling and includes a description of all the work that must be carried out at the construction site, along with the flow of the works, as well as a PERT chart and a Gantt chart.
Sekundarne ključne besede: civil engineering;construction site organisation;time scheduling;
URN: URN:SI:UM:
Vrsta dela (COBISS): Diplomsko delo/naloga
Komentar na gradivo: Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo, Gradbeništvo
Strani: IX, 87 f., [3] zganj. pril.