diplomsko delo visokošolskega študijskega programa
Aljoša Ciglar (Author), Uroš Klanšek (Mentor), Zoran Pučko (Co-mentor)

Abstract

V diplomski nalogi je obravnavan projekt organizacije gradbišča in izdelava terminskega plana za potrebe gradnje nove telovadnice I. gimnazije v Celju. Naloga vsebuje podrobno predstavitev objekta in tehničnih značilnosti njegove gradnje. Podrobno je razdelana organizacija gradbišča, ki obsega proučitev pogojev gradnje, dimenzioniranje začasnih objektov in inštalacij na gradbišču in ureditev gradbišča. Kot priloga k organizaciji gradbišča je izdelana tudi shema ureditve gradbišča. Izdelan je terminski plan, ki je prikazan z uporabo mrežne tehnike planiranja in z modificiranim gantogramom. K terminskemu planu je prav tako dodano tudi tehnično poročilo.

Keywords

gradbeništvo;organizacija gradbišča;terminski plan;gantogram;mrežna tehnika planiranja;diplomske naloge;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UM FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Publisher: [A. Ciglar]
UDC: 69.05+005.82(043.2)
COBISS: 20456982 Link will open in a new window
Views: 1247
Downloads: 140
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Building site organization and construction time scheduling for gym at First high school in Celje
Secondary abstract: This thesis presents organization of the construction site and construction time scheduling for the purpose of building new gym at first high school in Celje. It includes detailed presentation of the facility and tehnical characteristics of its construction. Elaborated building site organization contains construction conditions research, dimensioning of temporary objects and installations on the building site and construction site arrangement. Construction site organization sheme is attached to the construction site arrangement. Project scheduling is presented using Gantt chart and network diagram. Tehnical report is also added to the project scheduling.
Secondary keywords: civil engineering;organization of the construction site;construction time scheduling;gantt chart;network diagram;
URN: URN:SI:UM:
Type (COBISS): Undergraduate thesis
Thesis comment: Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo
Pages: XI, [80] f., [3] zganj. pril. z načrti
ID: 9166743