diplomsko delo
Nejc Korošec (Avtor), Iztok Palčič (Mentor), Zlatko Nedelko (Mentor)

Povzetek

V diplomskem delu sem predstavil idejo vitke proizvodnje, ki velja za novodobno proizvodno filozofijo. Z metodami, ki spadajo pod vitko proizvodnjo, sem v praktičnem delu naloge predlagal spremembe s katerimi bi optimiziral proizvodne procese v podjetju Tovarna kos in srpov d.o.o. Z metodo analize vrednostnih tokov VSM sem predstavil trenutno stanje v proizvodnji in odkril ozka grla. Za odstranitev ozkih grl sem predlagal vpeljavo metode 5S za organizacijo delovnih mest, metodo celovitega preventivnega vzdrževanja TPM in metodo hitre menjave orodja SMED. Opisal sem predvidene učinke, ki bi jih te metode imele in opozoril na probleme, ki bi se lahko pojavili med njihovo vpeljavo.

Ključne besede

proizvodni proces;vitka proizvodnja;metoda vrednostnih tokov;metoda VSM;metoda SMED;metoda TPM;metoda 5S;diplomske naloge;

Podatki

Jezik: Slovenski jezik
Leto izida:
Tipologija: 2.11 - Diplomsko delo
Organizacija: UM FS - Fakulteta za strojništvo
Založnik: [N. Korošec]
UDK: 658.51+005.591.6(043.2)
COBISS: 42830595 Povezava se bo odprla v novem oknu
Št. ogledov: 460
Št. prenosov: 122
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: Optimization of production processes in the company Tovarna kos in srpov d.o.o.
Sekundarni povzetek: The diploma introduces the modern-day manufacturing philosophy called lean manufacturing. The methods, that make up lean manufacturing, were used to suggest changes that would optimise the production processes in the company Tovarna kos in srpov d.o.o. With the use of the method of value stream mapping (VSM), the current state of the production line was presented, and bottlenecks were identified. The lean manufacturing methods 5S, TPM and SMED were suggested for implementation and bottleneck elimination. The expected effects of these methods were described and possible problems to occur during the implementation process were pointed out.
Sekundarne ključne besede: production process;lean manufacturing;value stream mapping;VSM;single minute exchange of die;SMED;total preventive maintenance;TPM;5S method;
Vrsta dela (COBISS): Diplomsko delo/naloga
Komentar na gradivo: Univ. v Mariboru, Fak. za strojništvo
Strani: VII, 42 f., [2] f. pril.
ID: 12022135
Priporočena dela:
, magistrsko delo Organizacija in management poslovnih in delovnih sistemov
, diplomsko delo univerzitetnega študija
, diplomsko delo visokošolskega strokovnega študija Organizacija in management delovnih sistemov