diplomsko delo
Povzetek
V diplomskem delu sem predstavil idejo vitke proizvodnje, ki velja za novodobno proizvodno filozofijo. Z metodami, ki spadajo pod vitko proizvodnjo, sem v praktičnem delu naloge predlagal spremembe s katerimi bi optimiziral proizvodne procese v podjetju Tovarna kos in srpov d.o.o. Z metodo analize vrednostnih tokov VSM sem predstavil trenutno stanje v proizvodnji in odkril ozka grla. Za odstranitev ozkih grl sem predlagal vpeljavo metode 5S za organizacijo delovnih mest, metodo celovitega preventivnega vzdrževanja TPM in metodo hitre menjave orodja SMED. Opisal sem predvidene učinke, ki bi jih te metode imele in opozoril na probleme, ki bi se lahko pojavili med njihovo vpeljavo.
Ključne besede
proizvodni proces;vitka proizvodnja;metoda vrednostnih tokov;metoda VSM;metoda SMED;metoda TPM;metoda 5S;diplomske naloge;
Podatki
Jezik: |
Slovenski jezik |
Leto izida: |
2020 |
Tipologija: |
2.11 - Diplomsko delo |
Organizacija: |
UM FS - Fakulteta za strojništvo |
Založnik: |
[N. Korošec] |
UDK: |
658.51+005.591.6(043.2) |
COBISS: |
42830595
|
Št. ogledov: |
460 |
Št. prenosov: |
122 |
Ocena: |
0 (0 glasov) |
Metapodatki: |
|
Ostali podatki
Sekundarni jezik: |
Angleški jezik |
Sekundarni naslov: |
Optimization of production processes in the company Tovarna kos in srpov d.o.o. |
Sekundarni povzetek: |
The diploma introduces the modern-day manufacturing philosophy called lean manufacturing. The methods, that make up lean manufacturing, were used to suggest changes that would optimise the production processes in the company Tovarna kos in srpov d.o.o. With the use of the method of value stream mapping (VSM), the current state of the production line was presented, and bottlenecks were identified. The lean manufacturing methods 5S, TPM and SMED were suggested for implementation and bottleneck elimination. The expected effects of these methods were described and possible problems to occur during the implementation process were pointed out. |
Sekundarne ključne besede: |
production process;lean manufacturing;value stream mapping;VSM;single minute exchange of die;SMED;total preventive maintenance;TPM;5S method; |
Vrsta dela (COBISS): |
Diplomsko delo/naloga |
Komentar na gradivo: |
Univ. v Mariboru, Fak. za strojništvo |
Strani: |
VII, 42 f., [2] f. pril. |
ID: |
12022135 |