magistrsko delo
Pavel Žnidaršič (Avtor), Andrej Predin (Mentor)

Povzetek

Magistrska naloga, mala hidroelektrarna na reki Sopoti, je izdelana z namenom in ciljem ugotoviti smiselnost koriščenja tega vodnega vira. Izbira in obdelava te teme me je pritegnila iz tega razloga, ker je tu nekoč že obratovala mala hidroelektrarna, ki pa so jo približno pred dvajsetimi leti ustavili. V nalogi sem zajel in predstavil zakonodajo in postopke, ki so potrebni pri izvedbi takega projekta. Na splošno je, moja ugotovitev, da so v naši državi ti administrativni postopki preveč zahtevni, še bolj pa komplicirano zastavljeni. Na koncu naloge sem v ekonomski analizi prikazal in dokazal, z določenimi metodami , da je smiselno postaviti tako elektrarno in jo koristiti kot stalen obnovljiv vir.

Ključne besede

mala hidroelektrarna;vodne turbine;obnovljivi viri;vodna energija;reka Sopota;referenčni stroški;deklaracija;modra energija;zelena energija;projektna dokumentacija;

Podatki

Jezik: Slovenski jezik
Leto izida:
Izvor: Krško
Tipologija: 2.09 - Magistrsko delo
Organizacija: UM FE - Fakulteta za energetiko
Založnik: [P. Žnidaršič]
UDK: 621.311.2(043.3)
COBISS: 1024052060 Povezava se bo odprla v novem oknu
Št. ogledov: 5889
Št. prenosov: 714
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: Small hydro power plant at river Sopota
Sekundarni povzetek: The master's thesis The small hydro plant on the riverSopota ; (Mala hidroelektrarna na reki Sopoti) is written with an aim to asses the benefits of employing the previously mentioned hydro plant as anenergy source. The theme and its analysis intrigued me due to the fact that thepower plant used to be operational but closed its doors nearly twenty years ago. The thesis comprises of the presentation of the legislation and the legislativeprocedures needed for the execution of such a project. I have come to the conclusion that these administrative procedures are too overwhelming in our country and moreover, complicated. In the economic analysis at the end of the thesis I have demonstrated and proventhat the setting up and employment of such a hydro plant as a renewable energysource is reasonable.
Sekundarne ključne besede: small hydro power plant;water turbine;hydropower;Sopota;reference costs;declaration;blue energy;green energy;project documentation;
URN: URN:SI:UM:
Vrsta dela (COBISS): Magistrsko delo/naloga
Komentar na gradivo: Mag. delo, Univ. Maribor, Fakulteta za energetiko
Strani: IX, 66, 5 f.
Ključne besede (UDK): applied sciences;medicine;technology;uporabne znanosti;medicina;tehnika;engineering;technology in general;inženirstvo;tehnologija na splošno;mechanical engineering in general;nuclear technology;electrical engineering;machinery;strojništvo;electrical engineering;elektrotehnika;
ID: 5966
Priporočena dela:
, magistrsko delo
, diplomsko delo visokošolskega strokovnega študijskega programa
, diplomsko delo univerzitetnega študijskega programa 1. stopnje
, diplomsko delo univerzitetnega študijskega programa