diplomsko delo visokošolskega študijskega programa
Roman Goltnik (Avtor), Matjaž P. Nekrep (Mentor), Blanka Grajfoner (Komentor)

Povzetek

Diplomsko delo Mala hidroelektrarna Mlačnik, presoja izvedljivosti je izdelano z namenom in ciljem ugotoviti rentabilnost obnove obstoječe Francisove turbine in možnost pridobivanja električne energije iz vodne energije. Izbira in obdelava te teme nas je pritegnila, ker je na tem mestu dobrih 50 let obratovala žaga, ki jo je poganjala Francisova turbina. V delu je najprej predstavljeno delovanje dveh malih hidroelektrarn z različnima turbinama, nato pa je analizirana tehnična in ekonomska možnost obnove male hidroelektrarne na potoku Ljubija.

Ključne besede

električna energija;obnovljivi viri energije;mala hidroelektrarna;presoja izvedljivosti;diplomske naloge;

Podatki

Jezik: Slovenski jezik
Leto izida:
Tipologija: 2.11 - Diplomsko delo
Organizacija: UM FGPA - Fakulteta za gradbeništvo, prometno inženirstvo in arhitekturo
Založnik: [R. Goltnik]
UDK: 620.92:621.311.212(043.2)
COBISS: 20286742 Povezava se bo odprla v novem oknu
Št. ogledov: 1279
Št. prenosov: 188
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: SMALL HYDROPOWER PLANT MLAČNIK, FEASIBILITY STUDY
Sekundarni povzetek: The Thesis titled The Small Hydroelectric Plant Mlačnik – Feasibility study was written with the purpose and goal of assessing the cost-effectiveness of refurbishing the existing Francis turbine and producing electricity from the power of flowing water. This particular topic was of interest to us because a sawmill – powered by a Francis turbine – has been operating at this location for over 50 years. First, the operation of two small hydroelectric plants with different turbines is outlined, and then the technical and economical feasibility of refurbishing a small hydroelectric plant on the Ljubija brook is analysed.
Sekundarne ključne besede: electricity;renewable energy;small hydropower plant;feasibility study;
Vrsta dela (COBISS): Diplomsko delo
Komentar na gradivo: Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo
Strani: VIII, 67 f.
ID: 9153564