diplomsko delo
Povzetek
V diplomskem delu je obravnavana organizacija gradbišča in terminsko planiranje Hotela A v Žalcu. Najprej je predstavljen splošni opis objekta (lokacija, funkcionalna zasnova, velikost in tlaki prostorov v posameznih nadstropjih idr.). Sledi opis konstrukcije in njena obdelava, kakšni materiali bodo vgrajeni in njihove dimenzije. Zajeti so tudi komunali priključki in kako jih pravilno izvesti.
Organizacija gradbišča se prične s predhodnim proučevanjem pogojev gradnje objekta. Prikazane so dolžnosti investitorja in izvajalca, proučevanje lokacijske informacije, vplivov objekta na okolico in preskrba gradbišča s potrebnimi materiali. Predstavljeni so tudi tehnološki procesi grajenja za predvideni projekt, ureditev gradbišča, dimenzioniranje in postavitev začasnih objektov ter začasnih priključkov, ki so potrebni za normalno obratovanje gradbišča.
Zadnji del zajema terminsko planiranje, kjer so prikazane logično in racionalno razporejene aktivnosti na gradbišču. Opisane so aktivnosti, ki se bodo izvajale v fazi gradnje objekta in so prikazane v gantogramu, kjer so razvidni začetek, konec in dolžina trajanja posamezne aktivnosti ter medsebojne povezave. Na koncu bomo dobili skupno število dni, potrebnih od začetka do končanja vseh del na objektu, ki morajo biti izvedena v pogodbenem roku.
Ključne besede
gradbeništvo;organizacija gradbišča;terminsko planiranje;
Podatki
Jezik: |
Slovenski jezik |
Leto izida: |
2023 |
Tipologija: |
2.11 - Diplomsko delo |
Organizacija: |
UM FGPA - Fakulteta za gradbeništvo, prometno inženirstvo in arhitekturo |
Založnik: |
[J. Knez] |
UDK: |
69.05(043.2) |
COBISS: |
171739907
|
Št. ogledov: |
39 |
Št. prenosov: |
9 |
Ocena: |
0 (0 glasov) |
Metapodatki: |
|
Ostali podatki
Sekundarni jezik: |
Angleški jezik |
Sekundarni naslov: |
Construction site organization and building time scheduling for hotel A in Žalec |
Sekundarni povzetek: |
The thesis addresses the construction site organisation and building time scheduling for Hotel A in Žalec. First, the author provides a general description of the facility (location, functional design, size and flooring in individual storeys etc.). Next, the thesis describes the structure and its finishing, the materials that are to be installed and their dimensions. This includes the public utility connections and how to execute them in the correct manner.
Construction site organisation begins with a preliminary inspection of the conditions for the construction of the facility. The thesis examines the obligations of the investor and the contractor, review of the site plan information, the environmental impacts of the building and the supply of the necessary materials to the construction site. Furthermore, the thesis presents the technological processes of the construction of the facility, the arrangement of the construction site, dimensioning and the implementation of temporary facilities and temporary connections, necessary for normal operation of the construction site.
The final part of the thesis includes building time scheduling, which illustrates the logically and rationally distributed activities at the construction site. The activities that will be carried out during the construction stage are described and demonstrated in a Gantt chart, illustrating the beginning, the end and the duration of each activity and the precedence relationships between these activities. Finally, we will get the total number of days required from the beginning to the end of all the works on the site, which must be carried out within the contract’s deadline. |
Sekundarne ključne besede: |
construction;construction site organization;scheduling; |
Vrsta dela (COBISS): |
Diplomsko delo/naloga |
Komentar na gradivo: |
Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo, Gradbeništvo |
Strani: |
1 spletni vir (1 datoteka PDF (XII, 86 f.)) |
ID: |
19459405 |